SU 1424 lay below floor prep of the room which was present at the top of this SU in the N-W corner. The soil then extends down to bedrock throughout the SU, bedrock in the south east corner is cut by construction cut SU 1431. Construction cuts are present on the east and west sides of the SU, but not the northern limit.