After further study and identification of this area as a quarry, it appears that this is one of a series of cuts into the bedrock associated with quarry machinery. This one, specifically, may have accommodated one of the posts to which cranes’ tie-rods were tied
Shallow cut in tufo, possibly for a posthole, based on the lack of anthropogenic material and the diameter of the hole.