During post-excavation study, this feature was reinterpreted as a likely level surface for wall foundation 2256.
The SU may be an earlier phase of wall construction (or possibly a foundation of leveling) on a north-south alignment.
The SU was partially excavated earlier in the 2015 season, and will be continued in 2016.
N. tufo blocks beneath wall 2256