Cut into the bedrock for the construction of N-S wall 5008. Cut itself not visible, as the wall is leaning against the edge in the bedrock. Bedrock higher on the W side of wall 5008, and lower where the bedrock has been exposed on the E side of wall 5008. Therefore, we can reconstruct a cut activity, comparable to the construction cut 5074 for wall 5009. See SU 5008 for further discussion.