Drainage channel. The channel is cut into the floor 5321 and the bedrock (5133). The top of the channel consist of 2 small basins cut into the slabs belonging to the floor 5321 in order to collect waters. The settlement seems to belong to the same phase of the floor 5321.
Drainage channel probably to connect to the orange tufo floor 5321