SU 5394 consists of a layer of tufo floor preparation that corresponds to a phase earlier than that of the construction of SU 5366. It is interesting to note that the raised bedrock of the northern end of the SU corresponds almost exactly to the remains of the low-lying opus reticulatum wall located in room 11.
Floor preparation and cut in Room 12