Construction cut for wall 5369, cut into bedrock (5133). The cut is stepped or terraced from the level of bedrock at the road to facilitate placing the blocks. The western limit of the cut is presumably destroyed by the floor 5374. The cut may continue south of drain cover 5398 as cut 5431.