Layer of soil and rubble placed upon bedrock in order to level the surface for construction of building. Western and southern walls of room 1 appear to be built directly on this rubble. Layer appears to continue beneath northern wall of room 1. There is a shallow curving channel in the bedrock beneath the layer; this layer appears to have filled the channel as well.