During post-excavation study, this feature was reinterpreted as a possible leveling deposit for the floor levels of the 1B building, but this is largely conjectural.
The SU appears to be connected with the sequence of leveling layers. The surface was more compact than previous layers, indicating a possible walking space in relation to the building walls around it. The elevation is in fact at level with the cement floor south of SU 2032.