This robbery activity was responsible for the removal of several slabs of the grey tufo slab floor within room 5. It was after this robbery that the concrete drain feature (5336) seems to have been constructed in the center of this space, and that the foundation/drainage cut (5396) seems to have filled with an accumulation layer (5378).