Stratigraphic Units

Publication

Publication Status
Publication Year
Publication Notes

Basics

Excavation Year
Area
Definition
Formation Process
Stratigraphical Reliability
SU Type
Layer Distinguished By
Photos
Photo Model

Record Events

Filled Out By
Revised By
Finds Studied By
Filled Out On
Revised On
Finds Processed On
SU Closed

Inclusions

Class Frequency Details
Anthropic
Geologic
Organic

Soil Matrix

Composition
Clay %
Silt %
Sand %
Matrix
Compaction
Measured Compaction
Measured Compaction (kg per cm)
Color

Unit Limits

Northern Limit
Southern Limit
Western Limit
Eastern Limit
Depth Limit
Unit Limit Notes

Stratigraphic Sequence

Observations and Descriptions

Observations
Position
Shape

Layers

Surface
Inclusion Observations
Thickness Observations
Interface

Cuts

Cut Edges
Cut Sides
Cut Bottom
Cut Top Edge
Cut Bottom Edge
Cut Observations

Structural Remains

Alignment
Building Technique

Binding Agent
Mortar Description
Mortar Inclusions

Mortar Inclusion Size
Wall Facing

Foundations
Floor Type

Wall Finishing

Dimensions
Structure Description

Samples

Total Volume of Layer (buckets)
Soil Sampling
Soil Sample Quantity (buckets)
Soil Sample Fraction (%)
Sieving
Sieving Sample Quantity (buckets)
Sieving Sample Fraction (%)
Non Soil Sampling
Non Soil Sample Type
Non Soil Sample Size

Interpretations

Interpretations
2019-07-21 Alexandra Creola

This is a layer of concrete that binds together SU 6127, 6128, and 6175. It appears to be part of the construction base for the pier (made of SU 6127 and 6128) that likely would have once supported a column in this area. Other piers of a similar concrete construction with reused ashlar blocks are visible along the southern limit of G-1, suggesting a row of columns for what may have once been a portico area. This SU contains large pieces of tiles placed directly under the reused ashlars (6127 and 6128). These tiles in the concrete appear to have been used as a leveling surface to level the pier bases. We see an identical construction under the other pier blocks in G-1, in the concrete of SUs 6121 and 6195.

Dates and Phasing

Approximate Date of Layer
to
Date of Layer Observations
Creation Phase (First Phase Present)
Last Active Phase (Present and in Use)
Last Presence Phase (Last Phase Present, not in Use)

Faunal Register

Faunal NISP

Bulk Finds

Finds Observations
Finds Storage Notes
Bulk Finds
Lost / Damaged - Shed Fire 2020
Fire Damage Notes

Special Finds

Ceramics

Ceramics Assemblage Condition
Lost / Damaged - Shed Fire 2020
Ceramics Condition Comments
Ceramics

Glass

Glass

Spot Dates

Connected Forms

Features
73

Attachments

Attachments
PM2072_SU6173_SU6119_SU6167_SU6101_etc_extended.pdf
Photo Model

Room G-1 center-west

SU_6174_6175_6176_6162.jpeg
Photo

SU 6162, SU 6174, SU 6175, SU 6176. Photo taken from the north.

GPR_6176_annotation_ipad.pdf
Sketch