Layer of rubble deposited upon bedrock and consolidated with mortar to form leveling platform for floors 5792 and 5836 which overlay 5803. The edges were regularized along the cuts 5802 and 5833, indicating that these cuts pre existed and continued in use when 5803 was constructed.
Opus Signinum floor