SU 8196 is a layer of rubble which appears to have been deposited in order to level the area of Room I6 for construction of floor SU 8197. It thus relates to the latest phase of construction in this structure.
"Floor for room I-6; Leveling for floor for room I-6 "
Leveling for floor for room I-6, N-S wall west of room I-6, Stones west of wall 8217 in room I-5, E-W wall west of SU 8044, Patch of floor preparation east of wall 8217 in room I-6
Floor for room I-6; Rubble layer in room I-6 covered by floor SU 8197; Patch of floor preparation east of wall 8217 in room I-6; N-S wall west of room I-6; Stones west of wall 8217 in room I-5