Construction cut in bedrock for terracing wall 5006/5007. However, not that in this section, the wall has not yet been exposed, because the upper courses were robbed out. Together cuts 5132, 5131, 5117, and 5051 create a linear E-W ledge cut into the bedrock. Full depth of the cut was not exposed in the 2012 season.