East - west wall enclosing I4 on northern side and I5 to the south. Most likely a later phase than the outer walls or the I5 floor surfaces, as evidenced by the foundation tench for this wall that cuts through the floors.
Room I-4
Room I-5
Series of N-S running walls at eastern end of 2018 excavation area