Stratigraphic Units

Publication

Publication Status
Publication Year
Publication Notes

Basics

Excavation Year
Area
Definition
Formation Process
Stratigraphical Reliability
SU Type
Layer Distinguished By
Photos
Photo Model

Record Events

Filled Out By
Revised By
Finds Studied By
Filled Out On
Revised On
Finds Processed On
SU Closed

Inclusions

Class Frequency Details
Anthropic
Geologic
Organic

Soil Matrix

Composition
Clay %
Silt %
Sand %
Matrix
Compaction
Measured Compaction
Measured Compaction (kg per cm)
Color

Unit Limits

Northern Limit
Southern Limit
Western Limit
Eastern Limit
Depth Limit
Unit Limit Notes

Observations and Descriptions

Observations
Position
Shape

Layers

Surface
Inclusion Observations
Thickness Observations
Interface

Cuts

Cut Edges
Cut Sides
Cut Bottom
Cut Top Edge
Cut Bottom Edge
Cut Observations

Structural Remains

Alignment
Building Technique

Binding Agent
Mortar Description
Mortar Inclusions

Mortar Inclusion Size
Wall Facing

Foundations
Floor Type

Wall Finishing

Dimensions
Structure Description

Samples

Total Volume of Layer (buckets)
Soil Sampling
Soil Sample Quantity (buckets)
Soil Sample Fraction (%)
Sieving
Sieving Sample Quantity (buckets)
Sieving Sample Fraction (%)
Non Soil Sampling
Non Soil Sample Type
Non Soil Sample Size

Interpretations

Interpretations
2018-07-23 Erica Canavan

Wall forms the other half of doorway along with SU 8119 plugged by SU 8179.

2017-07-18 giorgio caturegli

Wall forms northwest corner of I-18. It likely forms other half of doorway along with SU 8119, now plugged by SU 8179. This belongs to the initial phase of the building. It may have formed part of an L-shaped wall along with SU 8133. Future excavation will clarify this relationship.

Dates and Phasing

Approximate Date of Layer
to
Date of Layer Observations
Creation Phase (First Phase Present)
Last Active Phase (Present and in Use)
Last Presence Phase (Last Phase Present, not in Use)

Faunal Register

Faunal NISP

Bulk Finds

Finds Observations
Finds Storage Notes
Bulk Finds
Lost / Damaged - Shed Fire 2020
Fire Damage Notes

Special Finds

Ceramics

Ceramics Assemblage Condition
Lost / Damaged - Shed Fire 2020
Ceramics Condition Comments
Ceramics

Glass

Glass

Spot Dates

Connected Forms

Features
61

Attachments

Attachments
PM1758_SU8133_SU8180_SU8179_SU8119_SU8178_SU8012_SU8199_SU8200_SU8246_SU8011_SU8232_SU8237_SU8238_SU
Photo Model

Southwestern portion of Area I at the end of season 2017

GPR_8180_sketch.pdf
Drawing

N-S wall (W) of Room I-18 S. of wall 8133

SU_8180_2.JPG
Photo

Taken from the east.

SU_8180_3.JPG
Photo

Taken fromthe north.

PM1998_SU8380_SU8381_SU8178_SU8391_SU8119_SU8386_SU8179_SU8180_SU8133_SU8246_SU8387_SU8199_SU8390_SU
Photo Model

Room I-18

pm2012_su8180_su8203_ex.pdf
Photo Model

N-S wall (W) of room I-18 S of wall 8133; Apsidal wall in northwest corner of area.

GPR_8180_sketch.pdf
Sketch

N-S wall (W) of room I-18 S of wall 8133

GPR_8180_sketch_2.pdf
Sketch

N-S wall (W) of room I-18 S of wall 8133

GPR_8180_sketch_3.pdf
Sketch

N-S wall (W) of room I-18 S of wall 8133

GPR_8180_sketch_4.pdf
Sketch

N-S wall (W) of room I-18 S of wall 8133

GPR_8180_sketch_5.pdf
Sketch

N-S wall (W) of room I-18 S of wall 8133

SU_8203_8209_8133_8180_8179_8119_8341_8340_sketch.pdf
Sketch

Sketch of Room I-20.